Skip to content
WaterDamage Restoration Norcross

Service ยท Drying and dehumidification

Norcross structural drying, explainedfrom wet framing back to normal

Once the standing water has gone, what remains is water inside the house itself: in the studs, subfloor, drywall and plaster. Structural drying pulls it out under measurement. In Georgia's humid air, the method makes as much difference as the machinery.

Call Now(770) 214-4477

Structural Drying: your call connects you with an independent contractor.

  • Moisture mapped first
  • Dry target set from your own house
  • Readings logged daily
  • Repairs only after clearance

Key facts: Structural Drying

  • With Structural Drying, aim to finish drying materials within the 24 to 48 hours the EPA advises. [1]
  • The EPA suggests indoor humidity below 60 percent, ideally 30 to 50 percent. [1]
  • The Norcross Historic District lists 194 contributing buildings, many older than modern drywall construction. [2]
  • Structural Drying: Atlanta recorded 66.99 inches of precipitation in 2020 and 53.81 inches in 2021. [3] [4]

How it works

Structural drying in plain terms

Structural drying is the controlled process of getting moisture out of a building's materials: studs, subfloor, joists, drywall, plaster and slab. Once the standing water has gone, what remains is water inside these materials, and that water leaves in only one way. It evaporates into the air, and then the air has to be dried or replaced.

Three things move that process along: air movement across wet surfaces, low humidity in the room and a reasonable temperature. Air movers supply the first, dehumidifiers the second and, where needed, heat the third. Getting the balance right is what separates a controlled job from a hopeful one. Too little dehumidification means the air simply soaks up water and passes it to dry rooms; too much heat without it can make humidity worse.

The word "controlled" matters here. The process has a measured start, a daily check and a defined finish, set out in the industry's ANSI/IICRC S500 standard. [5] What decides whether the job is finished is a moisture reading compared with a dry reference, not the date on a schedule.

When you need it

Signs a house still needs drying

Air movers angled along a wall with a dehumidifier running in a Georgia living room
Air movers sweep wet surfaces while a dehumidifier removes the moisture they release. Illustrative image.

The science

Why Georgia summers make this harder

Relative humidity is a measure of how close air is to holding all the water it can at that temperature. When the air is nearly full, water in materials has little reason to leave. On a muggy Norcross afternoon, that is the condition just outside the door. Opening up the house to "air it out" brings in that heavy air, and can raise the indoor humidity rather than lower it.

Experienced operators work with a closed building for this reason, using refrigerant or low-grain dehumidifiers to pull water out of the air and pipe it to a drain. In cold, drier winter spells, things are reversed somewhat: outside air may help, yet cold rooms slow evaporation and many dehumidifiers lose efficiency, so a contractor may have to add heat. Good practice takes a reading rather than assuming either way.

The EPA suggests keeping indoor humidity below 60 percent and ideally between 30 and 50. [1] During a drying job, the room itself is usually pushed lower, for a time, in order to pull the moisture out of materials more quickly.

Step by step

How a controlled drying job runs

  1. 1

    Survey and map the moisture

    A meter and sometimes a thermal camera show where the water went, including up walls and across subfloors. The results go on a simple floor plan.

  2. 2

    Set a dry target

    A reading from the same material in an unaffected part of the house becomes the goal, so the number is specific to your home.

  3. 3

    Remove what blocks drying

    Wet pad, soaked insulation and trapped vapour barriers such as vinyl or wallpaper may have to go. Baseboards often come off too.

  4. 4

    Place the equipment

    Air movers point along walls, and dehumidifiers are sized to the room volume and the wetness. Containment may be used to focus the effort.

  5. 5

    Open up cavities if necessary

    Small holes behind baseboards can let air into wall cavities. Bigger openings are needed if insulation is wet.

  6. 6

    Read and log every day

    Readings for each point are written down, and equipment is moved or removed as materials improve.

  7. 7

    Confirm dry

    The job ends when readings meet the target. You should receive a copy of the log.

  8. 8

    Hand over for repair

    Repairs begin only after that. Sealing up earlier is how a moisture problem gets built into a wall.

Equipment

Drying equipment and what it does

Common equipment and when it fits
EquipmentJobBest used for
Air moverMoves air across wet surfacesWalls, floors, around cabinets
Refrigerant dehumidifierCondenses water out of warm airTypical summer jobs at normal temperatures
Low-grain refrigerant dehumidifierReaches lower humidity than standard unitsDense materials and final stages
Desiccant dehumidifierAbsorbs moisture, works in cooler airCold spaces, crawl spaces, some commercial jobs
Floor mat systemDraws moisture through hardwoodCupped wood floors that may recover
Injectidry or cavity systemPushes air into closed spacesBehind cabinets and in wall cavities
HEPA air scrubberFilters airborne particlesWhere mold, dust or sewage may be present

You or a pro

What a homeowner can do, and where to stop

If the wet area is small and clean, a homeowner can do useful things: run the air conditioning, add a household dehumidifier and a fan, take up wet rugs and pull furniture from the walls. Check the humidity with a small gauge and keep an eye on it for a few days.

Professional help makes sense when the water got inside a wall or below the floor, when several rooms are involved, or when readings do not drop after a day or two. A consumer dehumidifier usually removes far less water per day than commercial equipment, and without a meter you cannot tell when you have finished.

  • Keep the windows shut if outdoor air is humid
  • Empty collection buckets, or fit a drain hose
  • Do not turn off equipment at night
  • Do not paint or lay flooring until readings clear

Materials

How long each material tends to hold water

General trade experience; every job varies
MaterialTypical behaviourWhat helps
DrywallGets wet and dries fairly quicklyAir flow; removal if paper is failing
Plaster and lathHolds moisture for longer, can look dry earlyPatience, low humidity, readings at depth
Stud framingSlow because of its thicknessOpening the cavity, sustained low humidity
Plywood or OSB subfloorHolds moisture at the seams and can swellRemoving pad, mats, drying from below
HardwoodCups, then slowly recovers or does notMats and gentle drying; delay any sanding
Concrete slab or blockVery slow to release moistureTime; test before new flooring goes down

Local specifics

Norcross house types and how they dry

Much of Gwinnett's housing is suburban frame construction, including crawl space homes and those with daylight lower levels. A two-level home built into a slope has one side against the soil, so a wet wall there may keep taking on moisture from outside unless the exterior drainage is addressed. Crawl space homes add a second problem: damp air under the floor can feed moisture back up into the joists even after the rooms above have been dried.

Downtown Norcross is different. The National Register district at the heart of the city lists 194 contributing buildings, with late Victorian and revival styles among them. [2] Some of those homes have plaster, old wood floors and wall cavities that behave differently from modern drywall. Drying has to be slower and more careful, and aggressive cutting may be neither needed nor welcome. Multi-family buildings along Buford Highway pose another challenge, because a dehumidifier in one unit cannot deal with moisture moving through shared floors and walls. [6]

Long rainy periods add to all of this. Atlanta's annual total varies widely from year to year; the National Weather Service recorded 66.99 inches in 2020 and 53.81 inches in 2021. [3] [4] A wet spell during a drying job can stretch the timetable simply because the building is fighting damp air at every opening.

When it is finished

How to tell the job is really finished

A proper handover includes the log of readings, showing each measured point coming down to the target. You should be able to see where the dry reference reading came from. If readings are not available, or if equipment is being removed although some are still high, ask why. Sometimes materials are being removed instead of dried, which is reasonable as long as you are told.

The feel of a surface is a poor guide. Paint films and tile can stay dry while a wall behind them is wet. Temperature can mislead too: a dry-feeling room may simply be warm. Thermal images can help find remaining cool, damp areas, but they are a way of deciding where to take a reading, not a replacement for one.

What can go wrong

Common failures and how to spot them

  • Too few dehumidifiersWindows steam up and humidity readings do not drop, so water just moves around.
  • Equipment left on a timer or turned offReadings rebound overnight, and the job gets longer rather than shorter.
  • Wet insulation left in placeReadings in a section of wall stubbornly refuse to fall.
  • A second water sourceA slow leak, a wet crawl space or a roof problem keeps replacing the water being removed.
  • Early removal of equipmentEverything looks fine, but musty smells return within a few weeks.
  • Closing up too soonNew drywall or flooring traps moisture, and failures appear in the new finish.

Safety

Older materials and shared air during drying

High-speed air movers can spread whatever is in a room. If there is sewage contamination or visible mold, the area needs containment and cleaning first, and an air scrubber may be used. Ask how they will prevent contaminated air travelling into clean rooms, and whether your heating and cooling system should be shut off while this happens.

Old materials need attention too. Disturbing paint in a pre-1978 home can raise lead concerns, and federal Renovation, Repair and Painting rules apply to certain paid work. [7] Many historic Norcross homes are well within that age range. Older insulation, flooring and joint compound can also contain asbestos, so ask about testing before anything is cut or sanded.

Decision

When drying in place is worth it, and when removal is better

Drying in place makes sense when the water was clean, the job was started early and the materials are structurally sound. Hardwood, plaster and built-in cabinetry are often worth the extra effort. Removal tends to be the better choice when materials are contaminated, have lost strength, are holding wet insulation or have been wet so long that mold is likely.

A good contractor will explain the choice in terms of water category, readings and the condition of each item. The decision should not be automatic in either direction. The soaked drywall guide on this site walks through the most common version of this question.

Containment

Drying chambers and why plastic goes up

A big house with one wet room does not need the whole building dried. Contractors often hang plastic sheeting to make a drying chamber around the wet area, so dehumidifiers work on a small volume of air and equipment is not wasted on rooms that were never wet. Containment also limits dust, and it keeps moist air from moving into clean areas. If there is sewage or mold involved, it serves as a safety barrier as well, usually with filtered air exhausted from the space.

You may see a zipper door taped to the plastic and hear the sheeting pull inward as the air moves. Ask the contractor to explain how you get through the house while this is up. Bathrooms and kitchens may be inside the chamber, so that conversation is worth having at the start rather than on the second evening.

HVAC

What your heating and cooling system should be doing

Whether to run central air during drying depends on what happened. If the unit and ducts stayed dry and the water was clean, cooling can help hold down humidity in unaffected rooms. If water reached the air handler, or if a duct in the crawl space or attic got wet, the system could spread moisture and contaminants, so it should be checked first. Contractors often close supply vents in the drying area to keep a chamber stable.

Wet ductwork is easily missed. Flexible duct with soaked insulation usually needs replacing, and sagging runs in a crawl space may hold water. Ask the contractor or an HVAC technician to inspect any ducts in the affected area before the job is signed off, and replace the filter after equipment has been running for several days, because the dust load is often unusually high.

Hidden places

Cabinets, tile and other spots that hold water

Base cabinets are a classic trap, because the toe kick hides a closed space above a wet floor. Contractors can remove the kick and blow air in, or drill small holes in a hidden location and inject dry air. Upper cabinets rarely need any of this, unless water came from above. Bathroom tile over cement board is slow to give up water behind it, and shower pans may need to be evaluated by a plumber if they were the original source.

Vinyl flooring, sheet goods and thick laminate act as vapor barriers that stop the subfloor from drying upward. They may have to come up even when they look undamaged. Wallpaper and oil-based paint on an older wall create a similar barrier, which is one reason a wall may stay wet longer than the equipment plan allowed for. The decision to remove finish or to wait should be based on readings over a couple of days.

Reading the log

What a daily drying log might show

Illustrative format only; the values depend on the job and the material
Reading pointWhat to look forConcern if
Each wet material pointFalling each day, levelling near targetFlat for two or more days
Dry reference pointStable from day to dayShifting, which suggests inconsistent method
Room humidityLower than outdoor air and fallingHigher than the rest of the house
Dehumidifier outputStrong at first, then taperingLow from the start in a wet room
Equipment listReduced as areas finishStays the same for the entire job with no reason

Commercial and rentals

When the building is not a single house

Drying a shop, office or apartment follows the same physics, but the planning differs. Equipment may have to work around trading hours, and electrical circuits may not be available in the amount a large setup requires. Multi-unit buildings need someone coordinating access to several homes, because a wet wall may be shared with a neighbour who has not noticed anything. It helps to keep a separate log for each unit.

Owners and managers should decide early who communicates with tenants and how. Short written updates on what has been done and when equipment will leave can prevent a lot of confusion, particularly in a building with several households or several languages.

Questions

Structural drying questions for Norcross homes

How long does structural drying take in Norcross?

Many clean-water jobs take three to five days once equipment is running, as a general trade rule of thumb. Plaster, hardwood, thick framing and humid weather can stretch that to a week or more. Readings against a dry reference decide when it is finished.

Why can't I just open the windows?

In humid weather, outside air often holds more moisture than the air indoors, so open windows can add water rather than remove it. Drying works best in a closed building with dehumidifiers, unless a reading shows that outdoor air is drier.

Can I use my own dehumidifier and fans?

For a small clean spill, yes, and it often helps. For a wet wall cavity or subfloor, household units rarely remove water quickly enough, and you will not have readings to confirm the result. Treat your own equipment as a first aid measure.

What is a dry reference reading?

It is a moisture reading taken from the same kind of material in part of the house that did not get wet. It tells you what normal looks like in your home, and it gives the drying job a specific target rather than a guess.

Will the equipment make the house hot and loud?

Yes, usually. Air movers are noisy, and dehumidifiers give off heat. Rooms are often warm, and the machines run around the clock. Ask whether the setup can be adjusted for bedrooms, but remember that turning machines off slows the drying.

Can drying be done in a crawl space?

Yes, but the method differs. Wet soil has to be covered, liners and vapor barriers fixed, and a dehumidifier placed where it can actually reach the air. The crawl space page explains why fans alone are rarely effective down there.

Do I need to leave the house during drying?

Often not for a clean-water job, although the noise and heat bother some people. Leaving makes sense with contamination, large mold growth, babies, vulnerable occupants or no working bathroom. Ask the contractor what they would advise for your situation.

Should drying logs go to my insurer?

Yes. Logs show what got wet, how quickly it dried and when it was finished, which supports the claim and the repair. Ask for a copy at the end of the job, and keep it with your photos and the written scope of work.

Can a slab be dried enough for new flooring?

Yes, but concrete releases moisture slowly and flooring makers often set their own moisture limits. Test before installing, and do not rely on how the surface looks or feels. New wood or vinyl over a damp slab is a common cause of early failure.

Sources and citations

  1. [1]U.S. EPA: A brief guide to mold, moisture and your home
  2. [2]National Park Service: Norcross Historic District (NRIS 80001086)
  3. [3]National Weather Service: 2020 annual climate summary
  4. [4]National Weather Service: 2021 annual climate summary
  5. [5]IICRC: ANSI/IICRC S500 water damage standard
  6. [6]Wikipedia: Buford Highway
  7. [7]U.S. EPA: Lead Renovation, Repair and Painting Program

Call

Is the house still damp after a leak?

Call the number on this page to speak with an independent contractor about drying and moisture readings.

Call now(770) 214-4477
Call Now(770) 214-4477